Skip to content

Changelog

What shipped, and what was left out on purpose

Each phase is approved in writing before it starts and closed with a statement of what was not built. Both halves are recorded here.

  1. Phase 1

    Interface construction

    Delivered

    • Public website including the importer led home page.
    • Browser only JSON structure inspection with a suitability report.
    • Profile Studio for invited profile collaborators.
    • Workspace Console and Platform Admin interfaces.
    • Bracket Index A2 identity applied across the product.
    • Stable image addresses under a single readable path.

    Deliberately excluded

    • No database, migration or stored record.
    • No operational authentication or session.
    • No email delivery, so no invitation can be sent.
    • No remote retrieval, image download or command execution.
    • No payment, verification, API or MCP capability.
  2. Phase 0

    Discovery, architecture and brand

    Delivered

    • Repository discovery and architecture proposal.
    • Entity model, import mapping proposal and threat model.
    • Sitemap and design system proposal.
    • Three brand directions, then the refined Bracket Index A2 identity.
    • Complete brand book and a 468 file asset suite.

    Deliberately excluded

    • Documentation only. Nothing was applied to the running product.